Shandong Gold adjusts its 2026 mine-produced gold output target to 36-38 tons

- The 2026 mine-produced gold target was revised from at least 49 tons to 36-38 tons.
- The changes are attributed to safety self-inspection triggered by mid-year industry incidents and increased domestic mining infrastructure construction in the second half.
- 2025 mine-produced gold volume was 48.89 tons.
- 2026 output is expected to decline by 11-13 tons year over year, impacting net profit.
