technologyDevelopingUpdated 18 h ago · since 18 Sept 2026

State Grid Xinjiang Electric Power completes a pilot program for valley-filling demand response.

State Grid Xinjiang Electric Power completed a pilot program for valley-filling demand response in the southern Xinjiang region, launched on July 20 and covering Kashgar, Kizilsu, and Hotan. The pilot achieved 376 response events, totaling 5.1166 million kWh with a 100.28% execution rate, and a maximum daily response load of 77.4 MW.

1 source1 country1 article1 independent outletsSource strength 22/100 ⓘState Grid
State Grid Xinjiang Electric Power completes a pilot program for valley-filling demand response.
Photo: geralt / Pixabay
coda.news analysis

Key facts

  1. 01Pilot started on July 20 and covers Kashgar, Kizilsu, and Hotan commercial and industrial electricity users.
  2. 02Total of 376 valley-filling demand response events; effective response energy 5.1166 million kWh; execution rate 100.28%.
  3. 03Maximum single-day response load reached 77.4 MW; maximum single response energy 386,800 kWh.
  4. 04Digitalized chain of invitation–response–monitoring implemented via the new load management system and Online State Grid app.
  5. 05The pilot demonstrates flexible demand-side adjustment for high-penetration renewable energy and aims to expand nationwide in Xinjiang.

AI-generated from the sources below. Always check the originals.

How each country tells it

So far one country has covered this event. Perspectives appear when media in a second country report it.

Sources

Summaries are AI-generated from the linked sources and may contain errors; always check the originals. We summarise and link; we never republish articles. Photos come from openly licensed libraries, official publicity material and brand logos, credited to their sources. If you own an image and want it credited differently or removed, email info@coda.news and we will act promptly.